contact us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right.


123 Street Avenue, City Town, 99999

(123) 555-6789


You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Construction & Detours


Construction began in June 2015.  The bridge crossing and adjacent roadways (California Street and Main Street) will need to be closed during all or portions of demolition and construction.  The exact dates of closure for the bridge, California Street, and Main Street are identified in a preliminary schedule (below).  All dates and details are subject to change. Updates on road closures and detours will be posted on this website throughout the demolition and construction process.  Project partners thank you in advance for your cooperation and patience.


The Minnesota Department of Transportation and City of Minneapolis have closed the south cantilever sidewalk of the St. Anthony/Northtown Bridge to all bicycle and pedestrian traffic. During a bridge inspection, MnDOT inspectors found significant deterioration of the bridge’s bracket connection. Pedestrian and bike traffic will be redirected to the north sidewalk until repairs are completed. A timeframe for completion is not yet available. 


 (Image below)

The local bus route is currently detoured around the bridge.  The bus will be re-routed back over the St. Anthony Northtown bridge after construction is complete.